Uranium Project

Kyrgyzstan

  • Peat hosted uranium oxide deposit with near-term, near-surface, low-cost, ISR production potential.
  • Under Option Agreement with USA incorporated owners International Mining Company Invest Inc (“IMC”).

JORC COMPLIANT URANIUM RESOURCE

INDICATED

3.657 M lbs U308
@ 0.011% (0.0% CUT-OFF)
(2.103 M LBS. U3O8 @ 0.056% WITH
0.024% U3O8 CUT-OFF)

INFERRED

1.854 M lbs U308
@ 0.015% (0.0% CUT-OFF)
(1.546 M LBS. U3O8 @ 0.067%, WITH
0.024% U3O8 CUT-OFF)

TOTAL

5.512 M lbs U308
(INDICATED & INFERRED)

EQUIVALENT VALUE

$ 151 M
AT 17 SEPTEMBER 2018 SPOT PRICE $27.40/LB U3O8

 

Conceptual exploration target of an additional 1.9 to 2.6 Mt of peat ranging 0.028 to 0.093 % U3O8 (U3O8 % = U% x 1.79)

PRODUCTION

  • Infrastructure around the project includes 12-month road access, electricity and water supplies. 48km from capital Bishkek and 95km from Karabalta uranium processing plant.
  • Trial production (2015) shows ISR mining technology (in situ leaching by Na2CO3 soda ash) as most favourable method of safely and economically recovering the uranium. Yellow cake successfully produced.
  • ISR by soda ash will extract Uranium with no negative impact to environment. Use of soda ash permitted under Kyrgyz law.
  • Significant exploration upside exists through drilling of adjacent prospective peat beds in the near vicinity of the current Resource.

Reports

Uranium Pilot Test Summary
568.72 KB
07/02/2019 09:28:56

Uranium Financial Summary
570.73 KB
07/02/2019 09:28:55

Image

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies). You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.

Ok